LIGHTNING PROTECTION CERTIFICATE
Lightning Protection System Documentation
BS EN 62305 | IET Lightning Protection Guidelines
⚠️ INCOMPLETE LIGHTNING PROTECTION CERTIFICATE
Missing required fields will result in an incomplete certificate. Please complete all required information for a professional certificate that meets BS EN 62305 standards.
Missing: Certificate Number, Building Details, System Description, Test Results, Equipment Details, Inspector Details, Company Details
⚡ Lightning Protection Standards Reference
BS EN 62305-1
Protection against lightning - General principles
BS EN 62305-2
Risk management
BS EN 62305-3
Physical damage to structures and life hazard
BS EN 62305-4
Electrical and electronic systems within structures
1
BUILDING/STRUCTURE DETAILS
Certificate Reference: [MISSING]
Owner/Client Name:
[MISSING]
Building Type:
[MISSING]
Building Address:
[MISSING]
Building Height (m):
[MISSING]
Building Length (m):
[MISSING]
Building Width (m):
[MISSING]
Contact Person:
[MISSING]
Contact Number:
[MISSING]
2
LIGHTNING PROTECTION SYSTEM TYPE
System Description:
[MISSING]
Installation Date:
[MISSING]
System Class:
[MISSING]
3
LIGHTNING PROTECTION STANDARDS & REQUIREMENTS
Component Standard Required Material Specification Minimum Cross-Section Installation Method
Air Termination Network BS EN 62305-3 Copper/Aluminium/Steel 50mm² (Cu), 70mm² (Al) Rolling sphere/Mesh/Angle
Down Conductors BS EN 62305-3 Copper/Aluminium/Steel 50mm² (Cu), 70mm² (Al) Straight route to earth
Earth Termination Network BS EN 62305-3 Copper/Steel/Concrete 50mm² (Cu), 80mm² (Steel) Ring/Radial earthing
Bonding Conductors BS EN 62305-3 Copper/Aluminium 16mm² minimum Equipotential bonding
Surge Protection BS EN 62305-4 Type 1/2/3 SPD As per manufacturer Coordinated protection
Design Standard:
[MISSING]
Inspection Date:
[MISSING]
Next Inspection Due:
[MISSING]
Inspection Frequency:
Not specified
4
LIGHTNING PROTECTION TESTING
Component Test Type Expected Value Measured Value Unit Result
No test results recorded
5
TEST EQUIPMENT
Test Equipment Model:
[MISSING]
Last Calibration Date:
[MISSING]
Calibration Due Date:
Not specified
Calibration Certificate Number:
Not specified
6
SYSTEM CONDITION & OBSERVATIONS
Air Termination Network
Not Completed
Down Conductors
Not Completed
Earth Termination Network
Not Completed
Bonding Connections
Not Completed
Surge Protection Devices
Not Completed
Fixings and Supports
Not Completed
Observations & Notes:
None recorded
Defects Found:
None recorded
Overall System Assessment:
[NOT SELECTED]
7
INSPECTOR DETAILS
Inspector Name:
[MISSING]
Position/Title:
[MISSING]
Relevant Qualifications:
[MISSING]
Professional Certification:
Not specified
Inspector Signature:
No signature available
8
COMPANY DETAILS
Company Name:
[MISSING]
Company Phone:
[MISSING]
Company Address:
[MISSING]
Company Email:
Not specified
Company Website:
Not specified