Emergency Lighting Site Compliance Certificate

Understand the BS 5266‑1 Annex K certificate for verifying an existing emergency lighting installation with no completion certificate — the 35‑point Annex L checklist, and how to fill it out and issue the PDF in Lux Meter Pro and our Cert It web app.

BS 5266‑1:2016
Annex K model certificate
35‑Point Checklist
Annex L compliance items
Existing Systems
No completion certificate
Instant PDF
Email to the client

What Is the Site Compliance Certificate?

The certificate used to verify an existing emergency lighting installation where no valid completion certificate is available, based on the model certificate in Annex K of BS 5266‑1:2016.

Purpose

Establishes compliance without paperwork

Many buildings have working emergency lighting but no completion certificate — often systems installed to an earlier edition of BS 5266‑1, or where the original documents were lost. The site compliance certificate lets a competent person verify and document that the existing installation complies, so the responsible person has evidence for the fire risk assessment.

Annex L

Backed by a 35‑point checklist

The certificate is supported by the Annex L compliance checklist — 35 items across system design and documents, emergency luminaires, test facilities, wiring and equipment, and a final declaration. Each carries a clause reference to BS 5266‑1.

Not for new work

Verification, not periodic testing

The site compliance certificate is for a one‑off verification of an existing system. It must not be used for routine periodic inspection and testing, which needs the Periodic Certificate, nor for new work, which needs a Completion Certificate.

The Certificate, Part by Part

The site compliance certificate follows Annex K in seven parts, with the Annex L checklist forming Part 5.

PartWhat it records & how to complete it
1. Contractor, client & installationYour trading title, address and registration; the client and their details; the installation address and occupier. Pre‑fills from your saved profile.
2. Installation coveredA description of the extent of the existing installation being verified — for example "complete site‑wide emergency lighting, 42 self‑contained luminaires, verified by full 3‑hour discharge test". Required.
3. Declaration of conformityThe responsible person signs on behalf of the owner/occupier, and the contractor signs to confirm the checklist, photometric design data and log book are all supplied. An optional reviewer can also sign. Names and confirmations required.
4. Reference documentsPrevious certificates, EICR, drawings, design data and the log book reference.
5. Compliance checklistThe 35‑item Annex L checklist, grouped and clause‑referenced, each marked ✓, ✗ or N/A. The person who carried out the assessment signs.
6. Deviations & recommended actionAny deviations found, with the clause number and the recommended remedial action. Marking a checklist item ✗ adds a line here automatically.
7. CommentsDefects on the existing installation not covered by the certificate, and general observations.
Three documents make it valid. The certificate is only valid when accompanied by the signed compliance checklist, the photometric design data, and the test log book. Where the original design data is unavailable, substitute data from the luminaire manufacturer may be used with the calculations appended — or attach an Illuminance Verification Report of measured lux levels.

How to Fill It Out in Lux Meter Pro

The same form is available on iPhone and iPad in the app, and in the browser through our Cert It web app.

Step 1

Start the certificate

Open Certifications, choose Site Compliance Certificate, and a certificate number is generated. Your contractor details pre‑fill from Settings.

Step 2

Describe the installation

Add the client, installation address and the extent of the existing system being verified.

Step 3

Confirm the documents

Tick that the photometric data and log book are supplied; the responsible person and contractor sign.

Step 4

Work the 35 items

Set each checklist item to ✓, ✗ or N/A. "Fill remaining" sets the untouched items in one tap. Any ✗ drops a line into Part 6.

Step 5

Record deviations

Add the recommended action for each deviation, and any comments on the existing installation.

Step 6

Generate & send

Generate the PDF and email it to the client, or save and share it. It is stored against the job for reissue later.

Before You Issue — Quick Checklist

Certificate number, client, installation address and extent are completed.
All 35 Annex L checklist items have an outcome (✓, ✗ or N/A).
Every ✗ has a deviation with recommended action in Part 6.
The responsible person, contractor and assessor have signed.
Photometric design data and the test log book are supplied.
Reference documents are listed in Part 4.

Verify Existing Systems From Your Phone or Browser

We build the site compliance certificate and its 35‑point Annex L checklist into Lux Meter Pro and our Cert It web app — work through the checklist on site, generate a clean BS 5266‑1 PDF, and email it to the client. Your details, logo and signature are saved once and applied to every certificate.

📱 Download Lux Meter Pro See all certificates