The Luminaire Test Schedule

The definitive guide to the emergency lighting luminaire test schedule — what it is, how monthly and annual testing differ, what every column means, worked examples, and exactly how to record per‑luminaire results in Lux Meter Pro. Written for electricians, facilities managers and responsible persons working to BS EN 50172 / BS 5266‑8 and BS 5266‑1:2016.

BS EN 50172
/ BS 5266‑8 test regime
Monthly & Annual
Functional & duration tests
Per‑Luminaire
Full audit trail
Instant PDF
Pass/fail counts

What Is a Luminaire Test Schedule?

A luminaire test schedule is a per‑luminaire record of emergency lighting test results. Where the emergency lighting log book gives the high‑level running record for a building, the test schedule zooms in: it lists each individual luminaire by reference and location, and against each one it records the rated duration, the duration actually achieved on test, the result (pass or fail) and any remarks.

It is the document that turns a single log‑book line such as “annual 3‑hour test — satisfactory” into defensible evidence that every one of the forty‑two luminaires on site was tested, and exactly how each performed. That level of detail is what a fire risk assessor, an insurer or an enforcing officer wants to see when the emergency lighting is scrutinised.

The schedule is used in three ways: as a standalone record kept with the log book after a monthly or annual test; as an attachment to a completion certificate proving the commissioning duration test; and as supporting evidence behind a periodic inspection and testing certificate or a site compliance certificate.

MonthlyFunctional (short) test of every luminaire
AnnuallyFull rated‑duration discharge test
180 minTypical rated duration (3 hours)
~24 hRecharge time after a full test

Why It Matters — and the Law Behind It

Emergency lighting is a life‑safety system. When the normal supply fails during a fire or power cut, it keeps escape routes visible so people can leave the building safely. That only works if every luminaire actually operates for long enough — which is why testing is not optional.

In England and Wales, the Regulatory Reform (Fire Safety) Order 2005 places a duty on the responsible person to ensure fire safety equipment, including emergency lighting, is maintained in efficient working order and in good repair. Scotland (Fire (Scotland) Act 2005) and Northern Ireland have equivalent duties. The recognised way to meet that duty is to test and maintain the system in accordance with BS 5266‑1:2016 and BS EN 50172:2004 / BS 5266‑8:2004, and to keep records.

Records are the part people forget. A perfectly maintained system with no paperwork is, to an inspector, indistinguishable from a neglected one. The luminaire test schedule is where the detailed record lives: it proves not just that a test happened, but that every luminaire was individually checked and how each performed.

Who is the “responsible person”? In most workplaces it is the employer, owner or occupier — whoever has control of the premises. They can delegate the testing to a competent contractor, but the legal duty to ensure it is done and recorded stays with them. A clear per‑luminaire schedule protects both parties.

Monthly vs Annual: Two Different Tests

The test schedule records both kinds of test. Knowing which one you are doing changes what you record and how you plan the visit.

 Functional (short) testFull rated‑duration test
FrequencyMonthlyAnnually
What happensEach luminaire is operated briefly from its battery to confirm it lights and, afterwards, that its charging indicator works.Every luminaire is run for its full rated duration (e.g. 3 hours) to prove the battery sustains the whole emergency period.
What you recordReference, location, pass/fail, any fault.Reference, location, rated duration, duration achieved, pass/fail, remarks.
Battery impactMinimal — a brief discharge.Batteries end nearly flat and need a recharge period before the system is fully ready again.
PlanningCan usually be done during occupied hours.Best done when premises are unoccupied, or with standby cover, because of the recharge window.
StandardBS EN 50172 / BS 5266‑8BS EN 50172 / BS 5266‑8, BS 5266‑1 clause 12
A note on daily checks. For installations with a central battery system or engineering monitoring, a brief daily visual check of the system indicators is also recommended — no test, just a glance to confirm the healthy indicator is lit. It doesn’t need a schedule entry, but it’s part of the regime BS EN 50172 describes.

Every Column Explained

The schedule is a table with one row per luminaire. Here is exactly what each column means and how to complete it.

ColumnWhat it means & how to complete it
RefThe luminaire’s unique reference — usually matching a label on the fitting and a position on the plan, such as EL01. In Lux Meter Pro references auto‑increment (EL01, EL02, EL03…) so you can work round the building quickly. Essential for traceability.
LocationA plain‑language description of where the luminaire is — “corridor outside room 12”, “top of stair 2”, “final exit, reception”. This is what lets someone find the fitting again if it fails.
TypeThe classification type to Annex F of BS 5266‑1: X for self‑contained (battery in the fitting) or Z for centrally supplied.
ModeThe mode of operation, 0–6 (non‑maintained, maintained, combined, and so on). Set the default once and only change it for the odd fitting that differs.
Rated (min)The luminaire’s rated emergency duration in minutes — 60, 120 or 180 (one, two or three hours). Most UK escape lighting is rated 180.
Achieved (min)On a full‑duration test, the time the luminaire actually stayed adequately lit. Equal to (or above) the rated figure is a pass; short of it is a fail. On a functional test you can leave this blank.
ResultPass or Fail. A fail means the luminaire did not operate correctly or did not sustain its rated duration.
RemarksAnything noteworthy — “battery failed at 95 min, replaced”, “lamp dim, cleaned”, “diffuser cracked”. Remarks turn a bare fail into an actionable record.
Type, mode and duration in one place. These three follow the Annex F classification used across BS 5266‑1 certificates, so the same shorthand you use on a completion or periodic certificate carries straight onto the schedule. Set them as row defaults and each new luminaire starts correct.

Worked Examples

Three rows from a real annual full‑duration test, and what each one tells you.

RefLocationTypeRatedAchievedResultRemarks
EL01Reception, final exitX180182PassHealthy, LED charge indicator OK
EL07Corridor B, outside stair 2X18095FailBattery failed at 95 min — replaced & retested, now 180+
EL12Plant roomX180180PassDiffuser cleaned, minor dust

Reading the rows

  • EL01 sailed past its rated 180 minutes — a healthy fitting. Recording “182” (rather than just ticking a box) is useful: a battery that only just makes duration this year may not next year.
  • EL07 failed at 95 minutes. This is the row that matters. The battery could no longer sustain the emergency period, so it was replaced on the spot and retested — the remark records both the failure and the fix, and the responsible person has a clear before‑and‑after.
  • EL12 passed, but the remark notes a clean. Small maintenance actions belong here too; they show the system is being looked after, not just tested.
Every fail needs a follow‑through. A failed luminaire is a gap in life‑safety cover. Either fix and retest it during the same visit (as EL07 above) or raise it on a Defects & Remedial Works report with a priority and a target date, and note the interim arrangements.

The Recharge Rule Nobody Should Skip

After a full rated‑duration test, the batteries in self‑contained luminaires are close to flat. Until they recharge — normally about 24 hours — those luminaires cannot provide the full emergency duration again. For that window the building is relying on a partially charged emergency lighting system.

This is why annual duration testing needs a little planning. BS EN 50172 recognises the issue: where the fire risk assessment requires continuous emergency lighting cover, you should either carry out the test when the premises are unoccupied, or provide alternative standby arrangements during the recharge period, or test in stages so that not all luminaires on a given escape route are discharged at once.

The luminaire test schedule helps here too. Because it records the date and time of each test and which luminaires were done, it demonstrates that the discharge was managed sensibly rather than leaving a whole building without cover at 9am on a Monday.

Practical tip: for occupied buildings, split the annual test across escape routes on different days, or run it out of hours. Record each batch as its own schedule so the recharge windows never overlap on the same route.

Standards & References

The luminaire test schedule sits within a small family of British and European standards. You don’t need to memorise them, but knowing which does what helps when a client or inspector asks.

  • BS 5266‑1:2016 — the code of practice for the emergency lighting of premises. Clause 12 covers testing and the servicing regime; the annexes provide the model certificates.
  • BS EN 50172:2004 / BS 5266‑8:2004 — emergency escape lighting systems. This is the standard that sets out the daily, monthly and annual testing routine and the requirement to keep records.
  • BS EN 1838:2013 — the lighting‑application standard that sets the actual light levels (1 lux on escape route centre lines, and so on). Relevant when you measure illuminance rather than just duration — see the Illuminance Verification Report.
  • BS EN 60598‑2‑22 — the product standard for emergency luminaires, and the source of the Annex F type/mode/facilities classification you record on the schedule.

The schedule itself is the practical record that ties them together: it evidences the BS EN 50172 test regime, using the BS EN 60598‑2‑22 classification, in support of the BS 5266‑1 certificates.

How to Record a Test Schedule in Lux Meter Pro

The same form is available on iPhone and iPad in the app, and in the browser through our Cert It web app. Everything is saved against the job so you can reopen and reissue it.

Step 1

Open a new schedule

Choose Luminaire Test Schedule from Certifications. A schedule number is generated and your contractor details pre‑fill from Settings. Optionally link it to a certificate number.

Step 2

Site & test details

Add the client, installation address, the areas covered, the test date and the type of test — functional, full duration, or commissioning.

Step 3

Set the row defaults

Set the default type (X/Z), mode and rated duration so every new luminaire row starts correct. Change them only on the fittings that differ.

Step 4

Work round the building

Add a luminaire, and the reference auto‑increments. Enter the location, the duration achieved, and mark pass or fail. Repeat as you move through the site.

Step 5

Handle the fails

Add a remark for each fail. “Mark untested as passed” fills the routine ones so you only touch the exceptions.

Step 6

Sign, generate & send

Sign the schedule, then generate the PDF — it shows tested, passed and failed counts. Email it to the client or keep it with the log book.

Live pass/fail counts. As you work, the schedule keeps a running tally of luminaires tested, passed and failed — so you know at a glance whether the site is clean or needs follow‑up before you’ve even generated the PDF.

Common Mistakes to Avoid

  • Recording only a pass/fail tick with no duration. On an annual test, the achieved minutes are the whole point — they’re your early warning of a battery on the way out.
  • Vague locations. “Corridor” is useless in a building with ten corridors. Name the exact spot so the fitting can be found.
  • Testing the whole building at 9am. Ignoring the recharge rule leaves escape routes without full cover. Stage the test or run it out of hours.
  • Leaving fails open. A failed luminaire that isn’t fixed or escalated is a live safety gap. Fix and retest, or raise a remedial works report.
  • No signature or date. An unsigned, undated schedule proves nothing. Sign it and let the app stamp the date.
  • Keeping it separate from the log book. The schedule is evidence for the log book; store them together so the audit trail is complete.

Before You Issue — Quick Checklist

Schedule number, client, installation address and areas covered are completed.
The test date and type (functional / full duration / commissioning) are set.
Every luminaire has a reference, location and a pass/fail result.
On a full‑duration test, the achieved minutes are recorded for each luminaire.
Every fail has a remark and a follow‑up (fixed and retested, or raised on a remedial report).
The schedule is signed and dated, and stored with the emergency lighting log book.

Frequently Asked Questions

What is a luminaire test schedule?

A per‑luminaire record of emergency lighting test results. It lists each luminaire by reference and location and records its rated duration, the duration it achieved on test, and whether it passed or failed. It supports the log book and can be attached to a completion, site compliance or periodic certificate as detailed evidence that every luminaire was tested.

What is the difference between a functional test and a full duration test?

A functional (short) test is a brief monthly operation of each luminaire to confirm it illuminates and its charging indicator works. A full rated‑duration test runs each luminaire for its complete rated time — typically three hours — annually, to prove the battery can sustain the emergency period. BS EN 50172 / BS 5266‑8 set out both.

How often should emergency lighting luminaires be tested?

A brief functional test monthly, and a full rated‑duration test annually, in line with BS EN 50172 / BS 5266‑8, plus a daily visual check of central‑system indicators where fitted. Every test is recorded in the log book, and the schedule provides the detailed per‑luminaire evidence behind those entries.

Do I have to recharge after a full duration test?

Yes. After a full discharge the batteries are nearly flat, so the luminaires can’t provide the full emergency duration again until they’ve recharged — normally about 24 hours. Where continuous cover is required, test out of hours, in stages, or provide standby arrangements during the recharge window.

What does “duration achieved” mean on the schedule?

The time, in minutes, that the luminaire stayed adequately lit during the discharge test. If a luminaire rated for 180 minutes goes dim at 95, you record 95 and mark it a fail — the battery can no longer sustain the rated emergency duration and should be replaced.

Can a luminaire test schedule replace the log book?

No. The log book is the overall running record for the installation; the schedule is the detailed per‑luminaire evidence for a particular visit, kept with the log book. Together they give a complete audit trail for a fire risk assessment or insurance inspection.